Schedule
Current schedule for 2020-01, all beamtime starts 9am the first day and ends 8am the end day unless noted (i.e., scheduled October 3 - 4 starts on 3rd at 9am and ends on 5th at 8am in the morning). 8am-9am on the start day is for beamline setup and other work.
Dates (start-end) | geometry | user | Beamtime source | shifts | Notes | Main support staff |
January 31 | USAXS | Commissioning | beamline | 3 | ||
February 1 | USAXS | Commissioning | beamline | 3 | ||
February 2 | USAXS | mail in | beamline | 3 | Ilavsky | |
*** | ||||||
February 4 | USAXS | Gadikota | 64770 | 3 | Kuzmenko | |
February 5 | USAXS | Gadikota | 64770 | 3 | Kuzmenko | |
February 6 | USAXS | Gadikota | 64770 | 3 | Kuzmenko | |
February 7 | USAXS | Carter | 56177 | 3 | Ilavsky | |
February 8 | USAXS | Carter | 56177 | 3 | Ilavsky | |
February 9 | USAXS | Carter | 56177 | 3 | Ilavsky | |
*** | ||||||
February 11 | USAXS | Hixon | 65886 | 3 | Ilavsky | |
February 12 | USAXS | Hixon/Qu/mail in | 65886, 67742 | 1,1,1 | Ilavsky | |
February 13 | USAXS | mail in | beamline | 3 | Ilavsky | |
February 14 | USAXS | Nakouzi | 67216 | 3 | Ilavsky | |
February 15 | USAXS | Su | 66051 | 3 | Kuzmenko | |
February 16 | USAXS | Su | 66051 | 3 | Kuzmenko | |
****** | ||||||
April 7 | USAXS | Commissioning | 3 | |||
April 8 | USAXS | Pozzo | 64790 | 3 | Kuzmenko | |
April 9 | USAXS | Pozzo | 64790 | 3 | Kuzmenko | |
April 10 | USAXS | Espitia | 66508 | 3 | Ilavsky | |
April 11 | USAXS | Espitia | 66508 | 3 | Ilavsky | |
April 12 | USAXS | Nallapaneni | 57241 | 3 | Ilavsky | |
*** | ||||||
April 14 | USAXS | Orme | 64598 | 3 | Kuzmenko | |
April 15 | USAXS | Orme | 64598 | 3 | Kuzmenko | |
April 16 | USAXS | Kim, Qu, mail in | 66819, 67742 | 1,1,1 | Ilavsky | |
April 17 | USAXS | Couty, mail in | 67280, beamline | 1, 2 | Ilavsky | |
April 18 | USAXS | Allen PUP | 57504 | 3 | Ilavsky | |
April 19 | USAXS | Allen PUP | 57504 | 3 | Ilavsky | |
*** | ||||||
April 22-25 | USAXS | Allen PUP | 57504 | 12 | Kuzmenko | |
April 26-27 | USAXS | Instrument | APS upgrade | 6 | Ilavsky |
*************************************************************************************************************
2019-03
Dates (start-end) | geometry | user | Beamtime source | shifts | Notes | Main support staff | ||
October 1 | USAXS |
|
beamline | 3 | ||||
October 2 | USAXS | Commissioning | beamline | 3 | ||||
October 3 | USAXS | Espitia | 66058 | 3 | Ilavsky | |||
October 4 | USAXS | Espitia | 66058 | 3 | ilavsky | |||
October 5 | USAXS | Jun | 65694 | 3 | Ilavsky | |||
October 6 | USAXS | Myers | 64660 | 3 | Kuzmenko | |||
*** | ||||||||
October 8 | USAXS | Gadikota | 64770 | 3 | Kuzmenko | |||
October 9 | USAXS | Gadikota | 64770 | 3 | Kuzmenko | |||
October 10 | USAXS | Beyond Rg | 3 |
|
Ilavsky | |||
October 11 | USAXS | Qu, mail in | 66367 | 2,1 | Kuzmenko | |||
October 12 | USAXS | Li | 65611 | 3 | Ilavsky | |||
October 13 | USAXS | Li | 65611 | 3 | Ilavsky | |||
*** | ||||||||
November 29 | USAXS | Commissioning | 3 | Ilavsky | ||||
November 30 | USAXS | Commissioning | 3 | Ilavsky | ||||
December 1 | USAXS | PUP | 57504 | 3 | Kuzmenko | |||
December 2 | USAXS | PUP | 57504 | 3 | Kuzmenko | |||
December 3 | USAXS | PUP | 57504 | 3 | Kuzmenko | |||
December 4 | USAXS | PUP | 57504 | 3 | Kuzmenko | |||
December 5 | USAXS | PUP | 57504 | 3 | Kuzmenko | |||
December 6 | USAXS | PUP | 57504 | 3 | Kuzmenko | |||
December 7 | USAXS | Sarnello | 64297 | 3 | Ilavsky | |||
December 8 | USAXS | Duke | 58583 | 3 | medical sprays | Ilavsky | ||
*** | ||||||||
December 10 | USAXS | Powell | 63765 | 3 | Diesel sprays | Ilavsky | ||
December 11 | USAXS | Powell | 63765 | 3 | Diesel sprays | Ilavsky | ||
December 12 | USAXS | Powell | 63765 | 3 | Diesel sprays | Ilavsky | ||
December 13 | USAXS | Powell | 63765 | 3 | Diesel sprays | Ilavsky | ||
December 14 | USAXS | Powell | 63765 | 3 | Diesel sprays | Ilavsky | ||
December 15 | USAXS | Commissioning | 3 | Ilavsky | ||||
December 16 | USAXS | Kryzsko | 68611 | 3 | Kuzmenko | |||
December 17 | USAXS | Kryzsko | 68611 | 3 | Kuzmenko |
*************************************************************************************************************
Schedule for 2019-02.
Dates (start-end) | geometry | user | Beamtime source | shifts | Notes | Main support staff | ||
June 18 | USAXS |
|
beamline | 3 | ||||
June 19 | USAXS | Commissioning | beamline | 3 | Blue Sky, Capillary flow cell |
Ilavsky | ||
June 20 | USAXS | mail in, Qu | beamline,62840 | 2,1 | Ilavsky | |||
June 21 | USAXS | staff | 65124 | 3 | Capillary flow cell | Kuzmenko | ||
June 22 | USAXS | Sai | 64198 | 3 | Ilavsky | |||
June 23 | USAXS | Sai | 64198 | 3 | Ilavsky | |||
*** | ||||||||
June 25 | USAXS | NX school, Asritha | 64629, 57241 | 1,2 | Ilavsky | |||
June 26 | USAXS | NX school, Lu Ma |
|
1,2 | Ilavsky | |||
June 27 | USAXS | NX school, Asritha |
|
1,2 |
|
Ilavsky | ||
June 28 | USAXS | NX school, TBA | 64629 | 1,2 | Ilavsky | |||
June 29 | USAXS | Beaucage | 64663 | 3 | Ilavsky | |||
June 30 | USAXS | Moore | 64333 | 3 | Liquid cell heater | Kuzmenko | ||
July 1 | USAXS | Moore | 64333 | 3 | Liquid cell heater | Kuzmenko | ||
July 2 | USAXS | Moore | 64333 | 3 | Liquid cell heater | Kuzmenko | ||
*** | ||||||||
July 5 | USAXS | Myers | 64660 | 3 | Ilavsky | |||
July 6 | USAXS | Gadikota | 64770 | 3 | Capillary flow cell | Kuzmenko | ||
July 7 | USAXS | Gadikota | 64770 | 3 | Capillary flow cell | Kuzmenko | ||
July 8 | USAXS | Gadikota | 64770 | 3 | Capillary flow cell | Kuzmenko | ||
July 9 | USAXS | Krauskopf | 62379 | 3 | Kuzmenko | |||
July 10 | USAXS | Pozzo | 64790 | 3 | Laser, utrasound | Kuzmenko | ||
July 11 | USAXS | Pozzo | 64790 | 3 | Laser, utrasound | Kuzmenko | ||
July 12 | USAXS | Pozzo | 64790 | 3 | Laser, utrasound | Kuzmenko | ||
July 13 | USAXS | Dobbins | 64312 | 3 | Ilavsky | |||
July 14 | USAXS | Kobor | 61594 | 3 | Ilavsky | |||
*** | ||||||||
July 17 | USAXS | Strumendo | 62846 | 3 | Capillary flow cell | Kuzmenko | ||
July 18 | USAXS | Strumendo | 62846 | 3 | Capillary flow cell | Kuzmenko | ||
July 19 | USAXS | Strumendo | 62846 | 3 | Capillary flow cell | Kuzmenko | ||
July 20 | USAXS | staff | beamline | 3 | staff | |||
July 21 | USAXS | Anovitz | 64036 | 3 | spinner stage | Ilavsky | ||
*** | ||||||||
July 23 | USAXS | Tajuelo | 64096 | 3 | RAD | Ilavsky | ||
July 24 | USAXS | Tajuelo | 64096 | 3 | RAD | Ilavsky | ||
July 25 | USAXS | Cheshire | 55547 | 3 | Ilavsky | |||
July 26 | USAXS | Strumendo | 62846 | 3 | Capillary flow cell | Kuzmenko | ||
July 27 | USAXS | Strumendo | 62846 | 3 | Capillary flow cell | Kuzmenko | ||
July 28 | USAXS | Strumendo | 64846 | 3 | Capillary flow cell | Kuzmenko | ||
*** | ||||||||
July 30 | USAXS | Kish | 3 | Cryo coller | Frith | |||
July 31 | USAXS | staff | beamline | 3 | staff | |||
August 1 | USAXS | BlueSky, Asritha | beamline, 57241 | 1,2 | Linkam 600 | Ilavsky | ||
August 2 | USAXS | Hammons/Lee | 56990 | 3 | Linkam | Ilavsky | ||
August 3 | USAXS | Hammons/Lee | 56990 | 3 | Linkam | Ilavsky | ||
August 4 | USAXS | Hammons/Lee | 59131 | 3 | Linkam | Ilavsky | ||
*** | ||||||||
August 6 | USAXS | Fernanda | 64553 | 3 | BlueSky testing | Kuzmenko | ||
August 7 | USAXS | Fernanda | 64553 | 3 | Kuzmenko | |||
August 8 | USAXS | Sarnello | 64297 | 3 | Kuzmenko | |||
August 9 | USAXS | Sarnello | 64297 | 3 | Kuzmenko | |||
August 10 | USAXS | McGlasson | 57153 | 3 | Ilavsky | |||
August 11 | USAXS | Staff | beamline | 3 | staff | |||
*** | ||||||||
August 13 - 19 | USAXS | PUP | 57504 | 21 |
TBD, |
staff | ||
August 20 | USAXS | staff | beamline | 2 | staff |
*************************************************************************************************************
Schedule for 2019-01, all beamtime starts 8am the first day and ends 8am the end day unless noted (i.e., scheduled February 3 - 4 starts on 3rd at 8am and ends on 5th at 8am in the morning).
Dates (start-end) | geometry | user | Beamtime source | shifts | Notes | Main support staff | ||||
January 29 |
|
|
beamline | 3 | ||||||
January 30 | USAXS | Jemian, Cheng | beamline, 62490 | 1,2 | Blue Sky testing | Ilavsky | ||||
January 31 | USAXS | cancelled | ||||||||
February 1 | USAXS | mail in, Cheng | 62490 | 1,2 | Kuzmenko | |||||
February 2 | USAXS | Lee | 59131 | 3 | Ilavsky | |||||
February 3 | USAXS | Krauskopf | 62379 | 3 | Ilavsky | |||||
*** | ||||||||||
February 5 | USAXS | Jemian, Hacha | beamline, 59665 | 1,2 | Blue Sky testing | Ilavsky | ||||
February 6 | USAXS | Dobbins | 62060 | 3 | Kuzmenko | |||||
February 7 | USAXS | Smith | 62702 | 3 |
|
Ilavsky | ||||
February 8/9 | USAXS | Ryan | 61209 | 6 | Kuzmenko | |||||
February 10 | USAXS | Rishi | 55709 | 3 | Ilavsky | |||||
*** | *** | *** | ||||||||
February 12 - 18 | USAXS | NIST PUP | 57054 | 18 | TBA | Ilavsky, Kuzmenko | ||||
** | ** | ** | ** | ** | ** | ** | ||||
April 2 | USAXS | Commissioning | Ilavsky | |||||||
April 3 | USAXS | Beamline, Jurkiewicz | 60255 | 1,2 | Ilavsky | |||||
April 4-5 | USAXS | Hoepfner | 53520 | 6 | Kuzmenko | |||||
April 6 - 9 | USAXS | Cheshire | 55547 | 9 | Ilavsky | |||||
April 10 - 12 | USAXS | Anovitz | 55329 | 9 | Kuzmenko | |||||
April 13 - 14 | USAXS | Orme | 56917 | 6 | Kuzmenko | |||||
** | ** | |||||||||
April 16 | USAXS | Kish | 62546 | 3 | cryostat | Kuzmenko | ||||
April 17 | USAXS | Mail-in | beamline | 3 | Ilavsky | |||||
April 18 | USAXS | Van Leeuwen | 59998 | 3 | Kuzmenko | |||||
April 19 | USAXS | Jemian, Gadikota | beamline, 61096 | 1, 2 | Flow cell | Kuzmenko | ||||
April 20 | USAXS | Gadikota | 61096 | 3 | Kuzmenko | |||||
April 21 | USAXS | Gadikota | 61096 | 3 | Kuzmenko | |||||
April 22 | USAXS | Mail in, backup | beamline | 2 | Ilavsky |
*************************************************************************************************************
Schedule for 2018-3:
Dates (start-end) | geometry | user | Beamtime source | shifts | Notes | Main support staff |
November 6 - 7 | commissioning, mail in | staff | beamline | 6 | ||
November 8 | USAXS | Sai | 58400 | 3 | Kuzmenko | |
November 9 | USAXS | Buttler | 58897 | 3 | Ilavsky | |
November 10 | USAXS | Beaucage | 53917 | 3 | Ilavsky | |
November 11 | USAXS | Myers | 53806 | 3 | Flow cell | Kuzmenko |
*** | ||||||
November 13 | USAXS | Nallapaneni | 57241 | 3 | Kuzmenko | |
November 14 | USAXS | Sinha | 61133 | 3 | Ilavsky | |
November 15 - 16 | USAXS | Gadikota | 61096 | 6 | Capillary flow cell | Kuzmenko |
November 17 - 20 | USAXS | Hammons, Orme | 56990, 56917 | 12 |
Linkam 600, |
Ilavsky, Kuzmenko |
*** | *** | *** | *** | *** | *** | *** |
November 23 - 24 | USAXS 440 | Setup, Peyronel, setup | 57543 | 6 | Ilavsky, Kuzmenko | |
November 25 | USAXS | Mail-in | beamline | 3 | Ilavsky | |
November 26 - December 2 | USAXS | NIST PUP | 57054 | 21 | Capillary Flow cell, Linkam 1500, 600, Hidden HP system |
Ilavsky, Kuzmenko |
December 4 - 5 | USAXS | Pozzo | 61009 | 6 | Laser system, ultrasound |
Kuzmenko |
December 6 | USAXS | Sanders, mail in | 59594 | 2, 1 | Ilavsky | |
December 7 | Blue Sky | Beamline | 3 | Ilavsky | ||
December 8 | USAXS | Gerhardt | 52044 | 3 | Kuzmenko | |
December 9 | USAXS | TBA | 3 | |||
December 11 - 14 | USAXS | Kastengren | 53402 | 12 | Diesel fuel spray | Ilavsky |
December 15 | USAXS | TBA | 3 | |||
December 16 | USAXS | TBA | 3 |
*************************************************************************************************************
Schedule for 2018-02
Dates (start-end) | geometry | user | Beamtime source | shifts | Notes | Main support staff |
May 30 - May 31 | commissioning | staff | beamline | 6 | ||
June 1 | USAXS | Myers | 53806 | 3 | Kuzmenko | |
June 2 | USAXS | Beaucage | 49530, 49461, 55709 | 3 | Kuzmenko | |
June 3 | USAXS | Dobbins | 57247 | 3 | Kuzmenko | |
June 5 | USAXS | Sai | 58400 | 3 | Kuzmenko | |
June 6 - 8 | USAXS | Hammons, Orme | 56990, 56917 | 9 | Kuzmenko | |
June 9 | USAXS | 3 | TBA | |||
June 10 | USAXS | mail-in | staff | 3 | TBA | |
*** | ||||||
July 24 | USAXS | setup, NX school, Owens | 58455, 57665 | 3 | Ilavsky | |
July 25 | USAXS | BlueSky, NX school, Nallapaneni | 58455, 51371 | 6 | Ilavsky | |
July 26 | USAXS | TBA, NX school, Nallapaneni | 58455, 51371 | 3 | Ilavsky | |
July 27 | USAXS | BlueSky, NX school, Mulderig | 58455, 54933 | 3 | Ilavsky | |
July 28 | USAXS | McGlasson | 57153 | 3 | Ilavsky | |
July 29 | USAXS, step scans | Duke | 58583 | 3 | Ilavsky | |
July 31 - August 5 | USAXS imaging, USAXS | NIST | 57504 | 18 | Ilavsky | |
August 7 | USAXS | NIST | 57504 | 3 | Kuzmenko | |
August 8 | USAXS | BlueSky, Park | 58683 | 2 | Kuzmenko | |
August 9 | USAXS | Mang | 58805 | 3 | High Explosives | Ilavsky |
August 10 | USAXS | Vlachos | 53106 | 3 | Kuzmenko | |
August 11 | USAXS | Vlachos | 53106 | 3 | Kuzmenko | |
August 12 | USAXS | Vlachos | 53106 | 3 | Kuzmenko | |
August 13 | USAXS | Mail in | 3 | Ilavsky | ||
August 14 | USAXS | BlueSky, Mail in | 3 | Ilavsky | ||
August 15 | USAXS | Murali, Libera | 57585 | 3 | Kuzmenko | |
August 16 | USAXS | Dai | 58942 | 3 | Kuzmenko | |
August 17 | USAXS | Sanders, TBA | 49390 | 2,1 | Ilavsky | |
August 18 | USAXS | Gadikota | 55573 | 3 | Kuzmenko | |
August 19 | USAXS | Gadikota | 55573 | 3 | Kuzmenko | |
August 20 | USAXS | Mail in | 2 | TBA | ||
*************************************************************************************************************
Schedule for 2018-01.
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
Main support staff
|
January 30 - February 5
|
|
Comissioning
|
|
18
|
|
|
February 6
|
High res USAXS
|
Peyronel
|
57543
|
3
|
|
Ilavsky
|
February 7
|
USAXS
|
Comissioning
|
|
1
|
|
|
February 7 4pm
|
USAXS
|
Muralidharan
|
57585
|
2
|
|
|
February 8
|
USAXS
|
Harimkar
|
56882
|
3
|
|
|
February 9
|
USAXS
|
Myers
|
53806
|
3
|
|
Kuzmenko
|
February 10
|
USAXS
|
McGlasson
|
57153
|
3
|
|
|
February 11
|
USAXS
|
Fan Yang
|
56898
|
3
|
|
|
February 13-15
|
USAXS
|
Moore
|
56609
|
9
|
|
Kuzmenko
|
February 16
|
USAXS
|
Liu |
57135
|
1
|
|
Ilavsky
|
February 16 | USAXS | mail-in / Muralidharan | 57585 | 2 | ||
February 17
|
USAXS
|
Nallapaneni
|
57241
|
1
|
|
|
February 17 4pm
|
USAXS
|
Harimkar
|
56882
|
2
|
|
|
February 18
|
USAXS
|
Park
|
48584
|
3
|
|
|
February 20 - 26
|
USAXS
|
Allen
|
PUP-57054
|
18
|
|
Ilavsky, Kuzmenko
|
|
|
|
|
|
|
|
April 3
|
USAXS
|
Comissioning
|
|
3
|
|
|
April 4 - 9
|
USAXS
|
ORNL
|
55547, 55329
|
15
|
|
Kuzmenko, Ilavsky
|
April 10 - 26
|
USAXS
|
LLNL
|
56917, 56990, 49484
|
18
|
|
Ilavsky, Kuzmenko
|
April 17-18
|
USAXS
|
Pozzo
|
50356
|
6
|
Laser
|
Kuzmenko
|
April 19
|
USAXS
|
Garnier
|
internal |
1
|
|
Ilavsky
|
April 19 4pm
|
USAXS
|
Nallapaneni
|
57241
|
2
|
|
Ilavsky
|
April 20
|
USAXS
|
Jemian
|
BlueSky | 1 |
|
Ilavsky
|
April 20, 4pm
|
USAXS
|
mail in/TBA
|
|
|
|
|
April 21 10am | USAXS | Beaucage | 1 | Ilavsky | ||
April 21-22 | USAXS | TBA | 6 | |||
April 23 | USAXS | Jemian | BlueSky | 1 | Ilavsky | |
Apriul 23, 4pm | TBA | |||||
April 24
|
USAXS
|
Gadikota
|
|
2
|
|
Kuzmenko |
*************************************************************************************************************
Schedule for 2017-3.
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
Main support staff
|
October 3 - 4
|
USAXS
|
Commissioning
|
|
6
|
Beamline, USAXS
|
|
October 5 - 6
|
USAXS
|
Nayak
|
54934
|
6
|
|
Kuzmenko
|
October 7
|
USAXS
|
Muralidharan
|
48683
|
3
|
|
Ilavsky
|
October 8
|
USAXS
|
Rishi/Beaucage
|
55709
|
3
|
|
Ilavsky
|
|
|
|
|
|
|
|
October 10 - 11
|
USAXS
|
Gerhardt
|
52044
|
6
|
|
Ilavsky
|
October 12
|
USAXS
|
Anovitz
|
55329
|
3
|
|
Ilavsky
|
October 13
|
USAXS
|
Conrad
|
55858
|
3
|
|
Kuzmenko
|
October 14
|
USAXS
|
Gadikota
|
55573
|
3
|
|
Kuzmenko
|
October 15
|
USAXS
|
staff
|
|
3
|
mail in
|
|
***
|
|
|
|
|
|
|
November 24 - 25
|
USAXS
|
Comissioning, mail-in
|
|
6
|
Beamline
|
Ilavsky
|
November 26
|
USAXS
|
Beaucage
|
49530
|
3
|
|
Kuzmenko
|
November 27
|
USAXS
|
Cai Ling
|
53295
|
3
|
|
Kuzmenko
|
November 28 - December 3
|
USAXS, imaging
|
NIST PUP
|
39086
|
18
|
|
Ilavsky
|
December 5
|
USAXS
|
Comissioning, Nallapaneni
|
51371
|
2
|
|
Ilavsky
|
December 6
|
USAXS
|
Van Leeuwen
|
49333
|
3
|
|
Kuzmenko
|
December 7 - 8
|
USAXS
|
Anovitz
|
55329
|
6
|
|
Ilavsky
|
December 9 - 10
|
USAXS
|
Vlachos
|
53106
|
6
|
|
Kuzmenko
|
|
|
|
|
|
|
|
December 12 - 15
|
USAXS
|
Kastengren
|
53402
|
12
|
Fuel spray
|
Ilavsky
|
December 16
|
USAXS
|
Comissioning, mail in
|
|
3
|
Beamline
|
Ilavsky
|
December 17
|
USAXS
|
Hamrinkar
|
56184
|
2
|
|
Ilavsky
|
*******************************************************************************
Schedule for 2017-2, all beamtime starts 8am the first day and ends 8am the end day unless noted.
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
Main support staff
|
May 31 - June 2
|
USAXS
|
Comissioning
|
|
9
|
Beamline, USAXS
|
|
June 3
|
USAXS
|
Boilin, beamline
|
53811
|
3
|
|
Ilavsky
|
June 4
|
USAXS
|
Andrews
|
52189
|
3
|
|
Kuzmenko
|
June 6 - 8
|
USAXS
|
Martin
|
52284
|
9
|
|
Kuzmenko
|
June 9
|
USAXS
|
Beaucage
|
53917
|
3
|
|
Ilavsky
|
June 10 - 11
|
USAXS
|
Mallapragada
|
53418
|
6
|
|
Ilavsky
|
June 13 - 14
|
2D USAXS
|
Dobbins
|
51465
|
6
|
2D USAXS
|
Ilavsky
|
June 15
|
USAXS
|
setup
|
|
3
|
|
Ilavsky
|
June 16
|
USAXS
|
Myers
|
53806
|
3
|
|
Kuzmenko
|
June 17
|
USAXS
|
Beamline
|
|
3
|
mail in
|
|
June 18
|
USAXS
|
Cai Ling
|
53295
|
3
|
Linkam 1500
|
Ilavsky
|
June 20 - 26
|
USAXS
|
NIST PUP
|
39086
|
18
|
|
Ilavsky, Kuzmenko
|
***
|
***
|
***
|
|
|
|
|
August 1
|
USAXS
|
Comissioning
|
|
3
|
|
|
August 2
|
USAXS
|
Ingram
|
46473
|
3
|
|
Ilavsky
|
August 3 - 4
|
USAXS
|
Gadikota
|
47938
|
6
|
|
Kuzmenko
|
August 5 - 6
|
USAXS
|
Huber
|
49443
|
6
|
|
Ilavsky
|
August 8 - 11
|
USAXS
|
NX school + Bolin, Beaucage, Nallapaneni
|
53834
|
12
|
|
Kuzmenko, Ilavsky
|
August 12 - 13
|
USAXS
|
Pozzo
|
47036
|
6
|
Laser?
|
Kuzmenko
|
August 15 - 16
|
USAXS
|
Hoepfner
|
53520
|
6
|
|
Ilavsky
|
August 17 - 18
|
USAXS
|
TBA
|
|
6
|
|
|
August 19 - 22
|
USAXS
|
Bukosky, Fears
|
51012, 49484
|
11
|
|
Kuzmenko
|
|
|
|
|
|
|
|
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
Main support staff
|
Jan 31 - Feb 2
|
USAXS
|
Comissioning
|
|
9
|
Beamline, USAXS
|
|
February 3
|
USAXS
|
Andrews/ Gadikota
|
49667
|
6
|
Capillary Flow cell
|
Andrews
|
February 5
|
USAXS
|
Beaucage
|
49461/49530
|
3
|
|
Kuzmenko
|
February 7
|
USAXS
|
Fears
|
49484
|
6
|
|
Kuzmenko
|
February 9
|
USAXS
|
Bukosky
|
51012
|
6
|
|
Kuzmenko
|
February 11
|
USAXS
|
Vlachos
|
50777, 50995
|
6
|
|
Andrews,
Kuzmenko
|
February 14
|
USAXS
|
Internal
|
|
3
|
Mail-in
|
|
February 15
|
USAXS
|
Cochran
|
51574
|
6
|
|
Ilavsky, Andrews
|
February 17
|
USAXS
|
Reiser
|
48668
|
3
|
|
Ilavsky
|
February 18
|
USAXS
|
Park
|
48605
|
3
|
|
Kuzmenko
|
February 19
|
USAXS
|
TBA
|
TBA
|
6
|
|
TBA
|
***
|
***
|
***
|
***
|
***
|
***
|
***
|
April 4
|
USAXS
|
Comissioning
|
|
3
|
|
|
April 5
|
USAXS
|
Sanders
|
49390
|
3
|
|
Ilavsky
|
April 6
|
USAXS
|
Cooper/Zhang
|
50004
|
3
|
High Explosives
|
Ilavsky
|
April 7
|
USAXS
|
Guo/Zhang
|
52347
|
9
|
|
Kuzmenko
|
April 11
|
USAXS
|
Bagge-Hansen
|
46970
|
6
|
|
Ilavsky
|
April 13
|
USAXS
|
Pozzo
|
50328
|
6
|
|
Kuzmenko
|
April 15
|
USAXS
|
Beaucage
|
49461/49530
|
3
|
|
Andrews
|
April 16
|
USAXS
|
Internal
|
|
|
mail-in
|
|
April 18
|
USAXS
|
Ilavsky, course
|
51449
|
3
|
|
|
April 19 - 24
|
USAXS
|
NIST
|
39086
|
17
|
|
Ilavsky
|
|
|
|
|
|
|
|
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
Main support staff
|
October 4 - 10
|
USAXS
|
Comissioning
|
|
18
|
Beamline, BNP, USAXS
|
|
October 11
|
USAXS
|
Greeshma Gadikota
|
47938
|
3
|
Capillary Flow cell, H2
|
Ilavsky, Andrews
|
October 12 - 14
|
USAXS
|
Strumendo
|
49596
|
9
|
Capillary Flow cell
|
Andrews
|
October 15 - 16
|
USAXS
|
Anovitz
|
49984
|
6
|
|
Ilavsky
|
October 18
|
USAXS
|
Elliott,
Yang, Andrews |
49967,
46477, 48435 |
3
|
|
Ilavsky,
Kuzmenko, Andrews |
October 19
|
USAXS
|
Rzayev,
Pozzo, Andrews |
44612,
47036, 48435 |
3
|
|
Ilavsky,
Kuzmenko, Andrews |
October 20
|
USAXS
|
Murphy
|
44701
|
3
|
|
Ilavsky
|
October 21
|
USAXS
|
Jun
|
48482
|
3
|
|
Kuzmenko
|
October 22 - 23
|
USAXS
|
Moore
|
49574
|
6
|
|
|
October 25 - 26
|
USAXS
|
Beaucage
|
49461
|
6
|
Soot
|
Ilavsky, Andrews
|
October 27
|
USAXS
|
Duke, Myers
|
50542, 43679
|
3
|
|
|
October 28
|
USAXS
|
Sanders
|
49390
|
3
|
|
Ilavsky
|
October 29 - 30
|
USAXS
|
Michael Bagge-Hansen
|
46970
|
6
|
Linkam 350V
|
|
***
|
***
|
***
|
***
|
***
|
***
|
***
|
December 6 - 7
|
USAXS
|
Martin
|
41864
|
6
|
SALS
|
Kuzmenko
|
December 8
|
USAXS
|
Comissioning
|
|
3
|
|
|
December 9
|
USAXS
|
Khaykovich
|
49629
|
1-2
|
Rad samples
|
Ilavsky
|
December 10
|
USAXS
|
Comissioning
|
|
|
|
|
December 11
|
2DUSAXS
|
Andrews
|
48435
|
3
|
|
|
December 13 - 19
|
XPCS, USAXS
|
NIST
|
39086
|
18
|
Linkam 600, 1500
|
Ilavsky
|
|
|
|
|
|
|
|
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
June 1 - 3
|
USAXS
|
Comissioning
|
|
9
|
|
June 4 - 7
|
2D USAXS
|
Ross Andrews
|
48435
|
9
|
12keV, 2D USAXS
|
June 8
|
USAXS
|
Jun Young-Shin
|
46901, 48482
|
3
|
|
June 9
|
USAXS
|
Sungwon Lee
|
48525
|
3
|
|
June 10
|
USAXS
|
Joelle Tammygail Reiser
|
48668
|
3
|
|
June 11
|
USAXS
|
Dale Schaefer + Debbie Myers
|
48335 + 43679
|
3
|
|
June 12
|
USAXS
|
Alisa Park
|
48584
|
3
|
|
June 14 - 20
|
USAXS
|
Alan Kastengren
|
43019
|
18
|
Diesel Fuel Spray
|
June 21 - 27
|
USAXS
|
NIST PUP
|
39086
|
18
|
Linkam 1500, HP system, Imaging
|
***
|
***
|
***
|
***
|
***
|
***
|
August 2
|
USAXS
|
Comissioning
|
|
3
|
|
August 3 - 5
|
USAXS
|
Michael Bagge-Hansen
|
46970
|
9
|
|
August 6 - 9
|
USAXS
|
Matteo Strumendo
|
46664
|
9
|
cap heater
|
August 10
|
USAXS
|
TBA
|
|
3
|
|
August 11 - 12
|
USAXS
|
NX School/Gadikota
|
48167/47938
|
6
|
cap heater
|
August 13
|
USAXS
|
Brian Ingram
|
46473
|
3
|
|
August 14
|
USAXS
|
Alex Beecher / Davita Watkins
|
48238 / 48261
|
3
|
|
August 16 - 18
|
USAXS
|
Megan Robertson
|
47044
|
9
|
|
August 19 - 21
|
USAXS
|
Matteo Strumendo
|
46664
|
9
|
cap heater
|
August 22
|
USAXS
|
TBA
|
|
3
|
|
August 23
|
USAXS
|
TBA
|
|
3
|
|
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
February 6 - 8
|
USAXS
|
Muralidharan
|
43662
|
6
|
TMS1500
|
February 8 - 9
|
USAXS
|
Ingram
|
46473
|
3
|
TMS1500
|
February 10 - 12
|
USAXS
|
Myers
|
43679
|
6
|
|
February 12 - 14
|
USAXS
|
Beaucage
|
42238
|
6
|
|
February 14 - 16
|
USAXS
|
Kupwande-Patil
|
44674
|
6
|
|
February 17 - 19
|
USAXS
|
Rice + Sharenko + Jun
|
46302, 44718, 46901
|
6
|
|
February 19 - 20
|
USAXS
|
Lee
|
42024
|
3
|
|
February 20 - 23
|
USAXS
|
Robertson
|
47044
|
9
|
THMS600
|
February 24 - 26
|
USAXS
|
Fernanda
|
41892
|
6
|
THMS600
|
February 26 - 29
|
USAXS
|
Bagge-Hansen
|
46970
|
9
|
THMS600, TMS1500
|
***
|
|
|
|
|
***
|
April 6 - 8
|
USAXS
|
Comissioning
|
|
5
|
|
April 7
|
USAXS
|
Rzayev
|
44612
|
1
|
|
April 8 - 9
|
USAXS
|
Yike Jang
|
46905
|
3
|
|
April 9 - 11
|
USAXS
|
Murphy
|
44701
|
6
|
|
April 11 - 12
|
USAXS
|
Gadikota
|
45139
|
3
|
|
April 13 - 19
|
USAXS, Imaging
|
NIST
|
PUP
|
18
|
everything
|
April 20 - 22
|
Imaging
|
Comissioning
|
|
6
|
|
April 22 - 23
|
USAXS
|
Hoepfner
|
45252
|
3
|
|
April 23 - 24
|
USAXS
|
Lee
|
42024
|
3
|
|
April 24 - 26
|
Instrument time
|
Instrument time
|
|
8
|
|
Dates (start - end)
|
geometry
|
user
|
beam time source
|
shifts
|
Notes
|
October 10 - 12
|
USAXS
|
Strumendo
|
45120
|
6
|
WAXS
|
October 12 - 13
|
USAXS
|
Padua / Uzun
|
43241
|
3
|
THMS600
|
October 14 - 16
|
USAXS
|
Ilavsky, course
|
43015
|
6
|
WAXS
|
October 16 - 17
|
USAXS
|
Peyronel
|
41892
|
3
|
WAXS, 24keV, THSM600+1500
|
October 17 - 20
|
USAXS
|
Li
|
45127
|
9
|
WAXS
|
October 21 - 22
|
USAXS
|
Rzayev + Fullmer
|
44612 & 44691
|
3
|
WAXS
|
October 22 - 23
|
USAXS
|
Sharenko
|
44718
|
3
|
WAXS
|
October 23- 24
|
USAXS
|
Xia
|
37424
|
3
|
WAXS
|
October 24 - 26
|
USAXS
|
Murphy
|
44701
|
6
|
THMS600
|
October 26 - 27
|
TBA
|
TBA
|
TBA
|
3
|
|
***
|
|
|
|
|
***
|
December 2
|
USAXS
|
Comissioning
|
|
1
|
|
December 2 - 4
|
USAXS
|
Myers
|
43679
|
5
|
|
December 4 - 5
|
USAXS
|
Prisk
|
42105
|
3
|
WAXS
|
December 5 - 7
|
USAXS
|
Sharenko + Harris
|
44718 & 44696
|
6
|
WAXS
|
December 7 - 8
|
USAXS
|
Gadikota
|
45139
|
3
|
WAXS, TS1500
|
December 9 - 15
|
USAXS, XPCS
|
NIST PUP
|
PUP
|
18
|
everything
|
December 16 - 18
|
Imaging
|
NIST PUP
|
PUP
|
6
|
|
December 18 - 19
|
USAXS
|
Schaefer
|
43259
|
3
|
WAXS
|
December 19 - 21
|
USAXS
|
Stanic
|
44228
|
6
|
WAXS
|
|
|
|
|
|
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 10 - 11
|
Comissioning
|
|
|
|
June 11 - 12
|
USAXS
|
Padua / Uzun
|
33132
|
3
|
June 12 - 13
|
Comissioning
|
|
|
3
|
June 13 - 14
|
USAXS
|
Beaucage
|
43899
|
3
|
June 14 - 15
|
USAXS
|
Ilavsky
|
44016
|
3
|
June 15 - 16
|
USAXS
|
Gadikota
|
43600
|
3
|
June 17 - 20
|
USAXS
|
NX school
|
42961
|
9
|
June 20 - 26
|
USAXS/Imaging/XPCS
|
Allen
|
PUP
|
15
|
June 26 - 27
|
Imaging
|
Myers
|
43679
|
3
|
June 27 - 28
|
Comissioning
|
|
|
3
|
June 28 - 29
|
USAXS
|
Dobbins
|
36066
|
3
|
June 29 - 30
|
USAXS
|
Willey
|
43953
|
3
|
June 30 - July 1
|
USAXS
|
Ilavsky
|
44016
|
3
|
July 1 - 2
|
USAXS
|
Green
|
43364
|
3
|
July 2 - 3
|
USAXS
|
Murphy
|
42701
|
3
|
July 7 - 13
|
USAXS, fuel spray
|
Kastengren
|
43019
|
21
|
July 15 - 16
|
USAXS
|
Muralidharan
|
43662
|
3
|
July 16 - 18
|
USAXS
|
Myers
|
43679
|
6
|
July 18 - 19
|
USAXS
|
Andrews + Schaefer
|
38347 + 43259
|
3
|
July 19 - 21
|
USAXS
|
Ilavsky
|
44016
|
6
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
February 25 - March 2
|
Beamline
|
Comissioning
|
|
|
March 4 - 10
|
USAXS
|
PUP
|
33132
|
|
March 11 - 12
|
USAXS
|
Svaikauskas
|
34419
|
3
|
March 12 - 13
|
USAXS
|
Padua
|
41976
|
3
|
March 13 - 15
|
USAXS
|
Dobbins/Beaucage
|
36066/42238
|
6
|
March 15 - 17
|
USAXS
|
Myers
|
34243
|
6
|
March 18 - 20
|
USAXS
|
Sungwon Lee/Winans
|
42024/37406
|
6
|
March 20 - 23
|
USAXS
|
Agrawal
|
41541
|
9
|
March 23 - 24
|
USAXS
|
Prisk
|
42105
|
3
|
March 25 - 26
|
USAXS
|
Muralidharan
|
41900
|
3
|
March 26 - 28
|
USAXS
|
Hammons
|
TBA
|
6
|
March 28 - 29
|
USAXS
|
Andrews
|
38347
|
3
|
March 29 - 31
|
USAXS
|
Martin
|
41864
|
6
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
October 1 (8am - 4pm)
|
Beamline
|
Startup
|
|
1
|
October 1 rest
|
USAXS Imaging
|
Setup
|
---
|
2
|
October 2 - 3 4pm
|
USAXS Imaging
|
Butler
|
40188
|
4
|
October 3 rest
|
USAXS
|
Setup
|
---
|
2
|
October 4 - October 5
|
USAXS
|
Myers
|
34243
|
3
|
October 5 - 7
|
USAXS
|
Winans
|
37406
|
6
|
***
|
***
|
***
|
***
|
***
|
October 8 - 10
|
2D USAXS
|
Prisk
|
40217
|
6
|
October 10 - 13
|
USAXS XPCS, USAXS
|
Andrews
|
40164, 36721
|
9
|
October 13 - 14
|
USAXS
|
Hammons
|
TBA
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 11(8am - 4pm)
|
USAXS
|
setup
|
|
1
|
June 11 4pm - June 12 4pm
|
USAXS
|
Chang
|
30912
|
3
|
June 12 4pm - June 13 8am
|
USAXS
|
Dobbins
|
36066
|
2
|
June 13 - June 15
|
USAXS
|
Allen
|
33132
|
6
|
June 15 - June 16
|
USAXS
|
Hammons
|
39138
|
3
|
June 16 - June 17
|
USAXS
|
NX school
|
38655
|
3
|
***
|
***
|
***
|
***
|
***
|
June 18 - June 19
|
USAXS
|
NX school, Andrews
|
38655, 36721
|
2+1
|
June 19 - June 21
|
USAXS
|
Jeffries
|
38449
|
6
|
June 21 - June 22
|
USAXS
|
Hammons
|
39138
|
3
|
June 22 - June 23
|
USAXS
|
Winans
|
37406
|
3
|
***
|
***
|
***
|
***
|
***
|
August 13 - August 16
|
USAXS Imaging
|
Levine
|
38816
|
9
|
August 16 (8am - 4pm)
|
USAXS
|
setup
|
|
1
|
August 16 4pm - August 17 8am
|
USAXS
|
Vogt
|
36087
|
2
|
August 17 - August 19
|
USAXS
|
Bhatia
|
37674
|
6
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
February 12
|
USAXS
|
Ilavsky
|
35735
|
2
|
February 12 (midnight)
|
USAXS
|
Willey
|
30791
|
4
|
February 14
|
USAXS
|
Orme
|
28796
|
3
|
February 15
|
USAXS
|
Lu
|
35732
|
3
|
February 16
|
USAXS
|
Myers
|
34243
|
3
|
February 17
|
USAXS
|
Winans
|
37406
|
3
|
February 19
|
USAXS
|
Pellegrini
|
31057
|
3
|
***
|
***
|
***
|
***
|
***
|
March 5
|
USAXS/USAXS Imaging
|
Ilavsky
|
35728
|
3
|
March 6 - 7
|
USAXS, USAXS XPCS
|
Allen
|
29910
|
6
|
March 8
|
USAXS
|
Johnson, Hammons
|
36165, 35745
|
3
|
March 9
|
USAXS
|
Andrews, Kuo, Dobbins
|
37631, 36721, 36066
|
3
|
March 10
|
USAXS
|
Ilavsky
|
35735
|
3
|
***
|
***
|
***
|
***
|
***
|
April 9-10
|
USAXS
|
Lee
|
34417
|
6
|
April 11
|
USAXS, USAXS Imaging
|
Ilavsky
|
35728
|
3
|
April 12-13
|
USAXS
|
Allen
|
29910
|
6
|
April 14
|
USAXS
|
Winans
|
37406
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
October 14 - October 15
|
USAXS
|
Ilavsky, Chang
|
35735, 30912
|
3
|
***
|
***
|
***
|
***
|
***
|
October 16 - October 17
|
USAXS
|
Hoffman
|
28654
|
3
|
October 17 - October 19
|
USAXS
|
Winans
|
35795
|
6
|
October 19 - October 20 (midnight)
|
USAXS
|
Chang, Johnson, Hammons
|
30912, 36165, 35754
|
5
|
October 20 (midnight) - October 22
|
USAXS
|
Myers
|
34234
|
4
|
***
|
***
|
***
|
***
|
***
|
October 23 - October 25
|
USAXS
|
Kastengren
|
34273
|
6
|
October 25 - October 25 (midnight)
|
USAXS
|
Ilavsky
|
35735
|
2
|
October 25 (midnight) - October 28
|
USAXS
|
Beyond Rg course, Schaefer
|
35678, 35629
|
7
|
***
|
***
|
***
|
***
|
***
|
December 6 - December 10
|
USAXS, USAXS XPCS
|
Allen
|
29910
|
12
|
December 11 - December 13
|
USAXS imaging
|
Ilavsky
|
35728
|
6
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 5 - June 7
|
USAXS/SAXS
|
Hammons
|
34043
|
6
|
June 7 - June 8
|
HEUSAXS
|
Winans
|
35228
|
3
|
June 8 - June 9
|
HEUSAXS
|
Svaikauskas
|
34419
|
3
|
June 9 - June 10
|
USAXS
|
Lee(Prakash), Sun
|
34417, 30947
|
3
|
June 10 - June 11
|
USAXS
|
Meyers
|
34243
|
3
|
***
|
***
|
***
|
***
|
***
|
June 12 - June 18
|
USAXS, USAXS XPCS...
|
Allen
|
29910, 33132
|
9, 9
|
***
|
***
|
***
|
***
|
***
|
June 19 - June 20
|
SAXS
|
Ilavsky, Huang
|
25734, 33956
|
3
|
June 20 - June 21
|
SAXS
|
Cheng (Chumangalah)
|
33852
|
3
|
June 21 - June 22
|
USAXS, 17keV
|
DeGeorge
|
33949
|
3
|
June 22 - June 24
|
USAXS, 17keV
|
Lee (Kuo), Archer, Connors
|
34015, 34784, 33962
|
6
|
***
|
***
|
***
|
***
|
***
|
June 26 - June 27 (~4pm)
|
USAXS
|
Kastengren
|
30742
|
4
|
June 27 (~4pm) - June 28
|
USAXS
|
Mancini
|
25994
|
2
|
June 28 - June 29
|
USAXS
|
TBA
|
|
4
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
Feb 13 (8am) - Feb 13 (4pm)
|
USAXS/SAXS
|
Ilavsky
|
commissioning
|
1
|
Feb 13 (4pm) - Feb 14 (4pm)
|
USAXS
|
Scrabalak
|
GUP 32766
|
3
|
Feb 14 (4pm) - Feb 14 (mid)
|
USAXS
|
Kameya
|
GUP 32918
|
1
|
Feb 14 (mid) - Feb 16
|
USAXS
|
Glazer
|
GUP 30850
|
4
|
Feb 16 - Feb 17
|
USAXS
|
Allen
|
GUP 27621
|
3
|
Feb 17 - Feb 18
|
USAXS
|
Willey
|
GUP 30791
|
3
|
Feb 18 - Feb 19
|
USAXS
|
Orme
|
GUP 28796
|
3
|
***
|
***
|
***
|
***
|
***
|
March 18 (8am) - March 18 (4pm)
|
SAXS
|
Ilavsky
|
commissioning
|
1
|
March 18 (4pm) - March 19 (8am)
|
SAXS
|
Fortner
|
GUP 32923
|
2
|
March 20 - March 21
|
USAXS
|
|
TBA
|
3
|
March 21 - March 23
|
SAXS
|
Janecek
|
GUP 30516
|
6
|
March 23 - March 26
|
USAXS
|
Schmidt
|
GUP 29679
|
9
|
***
|
***
|
***
|
***
|
***
|
Apr 14 (8am) - Apr 14 (4pm)
|
USAXS
|
Ilavsky
|
commissioning
|
1
|
Apr 14 (4pm) - Apr 15 (mid)
|
USAXS
|
Schaefer
|
GUP 32997
|
4
|
Apr 15 (mid) - Apr 18 (mid)
|
USAXS
|
Chang
|
GUP 30912
|
3
|
Apr 18 (mid) - Apr 22
|
USAXS
|
Allen
|
PUP29910
|
13
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
Nov 7 - Nov 8
|
USAXS/SAXS
|
Ilavsky
|
setup
|
3
|
Nov 8 - Nov 10
|
2D USAXS
|
Daymond
|
GUP 29883
|
6
|
Nov 10 - Nov 11
|
USAXS
|
Beaucage
|
GUP 30002
|
3
|
Nov 11 - Nov 12
|
USAXS
|
Willey
|
GUP 30791
|
3
|
***
|
***
|
***
|
***
|
***
|
Dec 1 - Dec 2
|
USAXS
|
Kastengren
|
GUP 30742
|
3
|
Dec 2 - Dec 3 (4pm)
|
SAXS 25keV
|
Huang
|
GUP 30837
|
4
|
Dec 3 (4pm) - Dec 4
|
2D USAXS
|
Wei-Ren Chen
|
GUP 31153
|
2
|
***
|
***
|
***
|
***
|
***
|
Dec 12 - Dec 13
|
USAXS
|
Wallace
|
GUP 31057
|
3
|
Dec 13 - Dec 18
|
USAXS, USAXS XPCS, 2D USAXS
|
Allen
|
PUP 29910
|
15
|
Dec 18 - Dec 19
|
HE USAXS
|
Ilavsky
|
GUP 26222
|
3
|
Dec 19 - Dec 19 (4pm)
|
USAXS
|
Chang
|
GUP 30912
|
1
|
Dec 19 4pm - midnight
|
USAXS
|
TBA
|
TBA
|
1
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 27 - June 28
|
USAXS/SAXS
|
Ilavsky
|
setup
|
3
|
June 28 - June 29
|
USAXS (25keV)
|
Ilavsky
|
GUP 26222
|
3
|
June 29 - July 3
|
USAXS, XPCS,..
|
Allen
|
PUP 29910
|
12
|
July 3 - July 4
|
USAXS (17keV)
|
Kee-Chul Chang
|
GUP 22656
|
3
|
***
|
***
|
***
|
***
|
***
|
July 5 - July 7
|
2D USAXS
|
Srirangam
|
GUP 29883
|
6
|
July 7 - July 8
|
2D USAXS
|
Rama
|
GUP 29502
|
3
|
July 8 - July 9
|
USAXS (17keV)
|
Beaucage
|
GUP 30002
|
3
|
***
|
***
|
***
|
***
|
***
|
|
|
|
|
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
July 11 - July 12
|
USAXS (17keV)/SAXS
|
Pelegrini
|
GUP 29572
|
3
|
July 12 - July 13
|
USAXS (17keV)
|
Wei-Ren Chen
|
GUP 29662
|
3
|
July 13 - July 15
|
USAXS (17keV)
|
Allen
|
GUP 22931
|
6
|
July 15 - July 17
|
USAXS (17keV)
|
Torres/Orme
|
GUP 28796, 24884
|
6
|
***
|
***
|
***
|
***
|
***
|
July 18 - July 20
|
USAXS (17keV)/SAXS
|
Eberle/Huang/Ilavsky
|
GUP 29612, 29903, beamline
|
6
|
***
|
***
|
***
|
***
|
***
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
February 23 - February 25
|
USAXS
|
Kramer
|
GUP 21541
|
6
|
February 25 - February 26
|
USAXS (17keV)
|
Beaucage
|
GUP 25208
|
3
|
February 26 8am - 4pm
|
USAXS (17keV)
|
Conrad
|
GUP 27623
|
1
|
February 26 (4pm) - February 27
|
USAXS (17keV)
|
Mancini
|
GUP 25994
|
2
|
***
|
***
|
***
|
***
|
***
|
February 29 - March 4
|
USAXS XPCS
|
Allen
|
PUP 20805
|
12
|
|
|
|
|
|
March 4 - March 6
|
USAXS (17keV)
|
Allen
|
GUP 22931
|
6
|
***
|
***
|
***
|
***
|
***
|
|
|
|
|
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
March 16 - March 17
|
SAXS 25-28keV
|
Kuzel
|
GUP 27657
|
3
|
March 17 - March 19
|
USAXS
|
Ilavsky, school
|
GUP 28316
|
6
|
March 19 - March 20
|
USAXS 17keV
|
van Buuren
|
GUP 24802
|
3
|
***
|
***
|
***
|
***
|
***
|
April 15 - April 16
|
USAXS, 17keV
|
Yang
|
GUP 25195
|
3
|
April 16 - April 17
|
USAXS, 17keV
|
Chang
|
GUP 22656
|
3
|
April 18 - April 21
|
USAXS 17keV
|
Hammons
|
GUP 26667
|
9
|
April 21 - April 22
|
USAXS 25keV
|
Ilavsky
|
GUP 25734
|
3
|
April 22 - April 25
|
USAXS, 12keV
|
Allen
|
GUP 27621
|
9
|
***
|
***
|
***
|
***
|
***
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
October 21 - October 21 (4pm)
|
USAXS, SAXS
|
Ilavsky
|
setup
|
1
|
October 21 (4pm) - Oct 22 (4pm)
|
USAXS (17keV)
|
Beaucage
|
GUP 2520
|
3
|
October 22 (4pm) - Oct 23 (8am)
|
USAXS (17keV)
|
Frelon
|
GUP 25142
|
2
|
October 23 - October 24
|
USAXS (17keV)
|
Schaefer
|
GUP 26110
|
3
|
October 24 - October 25
|
***
|
Ilavsky
|
Beamline commissioning
|
3
|
***
|
***
|
***
|
***
|
***
|
October 26 - October 27
|
SAXS, 17keV
|
van Buuren
|
GUP 24802
|
3
|
October 27 - October 29(4pm)
|
SAXS
|
Lee
|
GUP 21723
|
7
|
October 29 (4pm) - October 30
|
USAXS/SAXS
|
Mancini
|
GUP 25994
|
2
|
October 30 - October 31
|
USAXS, 17keV
|
Pfeifer
|
GUP 20661
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
November 2 - November 2 (4pm)
|
***
|
Ilavsky
|
Beamline commissioning
|
1
|
November 2 (4pm) - November 3
|
USAXS XPCS`
|
Freelon
|
GUP 26142
|
2
|
November 3 - November 7
|
USAXS XPCS
|
Allen
|
PUP 20805
|
12
|
November 7 - November 8
|
USAXS, 17keV
|
Allen
|
GUP 22931
|
3
|
***
|
***
|
***
|
***
|
***
|
November 9 - November 11
|
USAXS, 17keV
|
Mancini
|
GUP 25994
|
1
|
|
|
Gianfranco
|
GUP 23510
|
3
|
|
|
Chang
|
GUP 22656
|
2
|
November 11 - November 13
|
USAXS, 17keV
|
Ilavsky
|
GUP 25222
|
6
|
November 13 - November 14
|
***
|
Ilavsky
|
Beamline commissioning
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 22 - June 24
|
USAXS, SAXS
|
Ilavsky
|
GUP 24476, NX school
|
6
|
June 24 - June 27
|
USAXS/XPCS 10.5keV
|
Allen
|
PUP
|
9
|
June 29 - July 1 4pm
|
USAXS
|
Allen
|
GUP 22931
|
7
|
July 1 (4pm) - July 4
|
USAXS, 17keV
|
Beaucage
|
GUP 25208
|
6
|
NOTE: July 2, 2 shifts
|
USAXS, 17keV
|
Yang
|
GUP 25195
|
2
|
***
|
***
|
***
|
***
|
***
|
August 18 - August 20
|
USAXS, SAXS 17keV
|
van Buuren, Torres
|
GUP 24802, 24884
|
6
|
August 20 - August 22
|
USAXS, 17keV
|
Huang
|
GUP 23853
|
6
|
August 22 - AUgust 23
|
USAXS, 17keV
|
Pfeifer
|
GUP 20661
|
3
|
August 23 - August 25
|
USAXS, 17keV
|
Varga, Chang, Yang
|
GUP 24620, 22656, 25195
|
6,
2 shifts each |
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
April 6
|
SBUSAXS 12keV
|
Ilavsky
|
setup
|
0.5
|
April 6 (~noon)
|
SBUSAXS 12keV
|
Green
|
GUP 24001
|
3
|
April 7 (~noon) - 11
|
USAXS/XPCS
|
Allen
|
PUP
|
12
|
April 11(~noon) - 12
|
USAXS/SAXS
|
Ilavsky
|
setup
|
2
|
***
|
***
|
***
|
***
|
|
April 13 - 14
|
USAXS/SAXS
|
Ilavsky
|
setup, GUP 22261
|
2, 1
|
April 14 - 16
|
USAXS, 17keV
|
Coleman, Beuacage
|
GUP 22413, GUP 23910
|
6
|
April 16 - 17
|
USAXS, 17keV
|
Pfeifer
|
GUP 20661
|
3
|
April 17 - 19
|
USAXS, 17keV
|
Montavon
|
GUP 22261
|
6
|
***
|
***
|
***
|
***
|
|
April 20 - 23
|
USAXS, 17keV
|
van Buuren
|
GUP 24018
|
9
|
April 23- 24
|
USAXS, 17keV
|
Chang
|
GUP 22656
|
3
|
April 24 - 26
|
USAXS, 17keV
|
Kramer
|
GUP 21541
|
6
|
April 26 - midnight
|
USAXS, 17keV
|
Ilavsky
|
GUP 22261
|
2
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
December 1
|
USAXS 12keV
|
Schmitt
|
GUP
|
3
|
December 2
|
USAXS 12keV
|
Beyer
|
GUP
|
3
|
December 3
|
USAXS 12keV
|
van Buuren
|
GUP
|
3
|
****
|
****
|
****
|
****
|
***
|
December 4
|
USAXS XPCS
|
Allen/Levine
|
PUP
|
12
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
March 24 - 25
|
USAXS 12keV
|
Pfeifer
|
GUP 20661
|
3
|
March 25 - 27
|
USAXS 12keV
|
Akpalu
|
GUP 12097
|
6
|
March 27 - 29
|
USAXS 12/17keV
|
Ilavsky
|
GUP 20077
|
6
|
****
|
****
|
****
|
****
|
***
|
April 21 - 22
|
USAXS, 17keV
|
ilavsky, Lee, Rzayev
|
GUP 20358, 10389
|
3
|
April 22 - 23
|
USAXS, 17keV
|
Beyer
|
GUP 12616
|
3
|
April 23 - 25
|
SBUSAXS 12keV
|
Kim
|
GUP 20263
|
6
|
April 25 - 28
|
SBUSAXS/XPCS 10.5keV
|
Allen/Levine
|
PUP
|
9
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
November 4 - November 5
|
USAXS 12keV
|
Ilavsky
|
optics testing
|
3
|
******
|
|
|
|
|
November 5 - November 6
|
USAXS 12keV
|
Ilavsky, McDermot, Khousari
|
setup, internal, internal
|
3
|
November 6 - November 8
|
SBUSAXS, 12keV
|
Kim
|
GUP 11843
|
6
|
November 8 - November 8 (4pm)
|
SBUSAXS/USAXS 12keV
|
Furst/Mittal
|
GUP 12861
|
1
|
November 8 4pm - November 10
|
USAXS 12keV
|
Schaefer
|
GUP 12838
|
5
|
***
|
|
|
|
|
November 11 - November 12
|
USAXS 17keV
|
Pfeifer
|
GUP 10069
|
3
|
November 12 - November 13
|
USAXS, 17keV
|
Huang, Dobbins
|
GUP 10509, internal
|
3
|
November 13 - November 15
|
USAXS 17keV, flow cell
|
Allen
|
GUP 11532
|
6
|
November 15 - November 16
|
USAXS
|
Rzayev, Ilavsky
|
internal
|
3
|
***
|
|
|
|
|
November 22 - November 25 (midnight)
|
USAXS-XPCS
|
Allen, Ilavsky...
|
PUP
|
11
|
|
|
|
|
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 8
|
USAXS
|
Ilavsky
|
SXNS, GUP 11814
|
3
|
******
|
|
|
|
|
June 24 - June 26
|
USAXS
|
Ilavsky, Kohls
|
setup, testing
|
6
|
June 26 - June 27
|
USAXS
|
Ghantasala, Huang
|
GUP 10724, internal
|
3
|
June 27 - June 28
|
USAXS
|
Dobbins
|
GUP 11258
|
3
|
June 28 - June 29
|
USAXS
|
van Buuren
|
GUP 11552
|
3
|
June 29 - July 1
|
SBUSAXS(?)
|
Green
|
GUP 11515
|
6
|
July 1 - July 2
|
USAXS
|
Pfeifer
|
GUP 10069
|
3
|
****
|
|
|
|
|
August 10 - 11
|
USAXS
|
Ilavsky
|
setup, testing
|
3
|
August 12 - 15
|
USAXS
|
van Buuren / El-Dasher
|
GUP 10816, 11449
|
9
|
August 15 - 18
|
USAXS XPCS
|
Allen, Levine, Zhang
|
internal
|
9
|
August 18 - 19
|
USAXS
|
Ghantasala
|
GUP 11124
|
3
|
August 19 - midnight
|
USAXS
|
Stoltz
|
GUP 11158
|
2
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
February 18 - February 20
|
XPCS/SBUSAXS
|
Ilavsky
|
GUP 10517
|
6
|
February 20 - February 23
|
XPCS/SBUSAXS
|
Allen
|
PUP
|
9
|
******
|
|
|
|
|
March 18 - March 20
|
SBUSAXS
|
Kim
|
GUP 11254
|
6
|
March 20 - March 22
|
USAXS
|
Schaefer
|
GUP 11306
|
6
|
March 22 - March 23
|
USAXS
|
Verploegen
|
GUP11047
|
3
|
*****
|
|
|
|
|
April 8 - April 10
|
USAXS
|
van Buuren
|
GUP 10816
|
6
|
April 10 - April 12
|
USAXS
|
Rzayev, McDermott,Tudryn
|
GUP 10389, 10592, 10510
|
6
|
April 12 - April 13
|
USAXS
|
Pfeifer
|
GUP10069
|
3
|
April 13 - April 14
|
USAXS
|
Ilavsky
|
TBA
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
October 22 - October 22 (8pm)
|
SBUSAXS
|
Ilavsky, van Buuren
|
setup
|
~1.5
|
October 22 (8pm) - October 24 (4pm)
|
SBUSAXS
|
Kim
|
GUP 10405
|
~5.5
|
October 24 (4pm) - October 28
|
USAXS imaging
|
Long/Levine/Zhang
|
PUP
|
11
|
******
|
|
|
|
|
December 10 - December 11
|
USAXS
|
Ilavsky
|
setup
|
3
|
December 11 - December 12
|
USAXS
|
Pfeifer
|
GUP 10069
|
3
|
December 12 - December 12 (4pm)
|
SBUSAXS
|
Ilavsky
|
setup
|
1
|
December 12 (4pm) - December 15
|
SBUSAXS
|
Allen
|
PUP
|
8
|
December 15 - December 16
|
SBUSAXS
|
van Buuren
|
GUP 10816
|
3
|
*****
|
|
|
|
|
December 17 - December 19
|
USAXS
|
van Buuren
|
GUP 10816
|
6
|
December 19 - December 21
|
USAXS
|
Schaefer/Kohls
|
GUP 9194
|
6
|
December 21 - December 22
|
USAXS
|
Ilavsky
|
internal
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 27 - June 28
|
USAXS
|
Ilavsky
|
setup
|
3
|
June 28 - June 30
|
USAXS
|
SAS short course
|
RA
|
6
|
June 30 - July 2
|
USAXS
|
Schaefer/Kohls
|
GUP 10048
|
6
|
July 2 - July 3
|
USAXS
|
Pfeifer
|
GUP 10069
|
3
|
******
|
|
|
|
|
July 23 - July 26
|
USAXS
|
van Buuren
|
GUP 9434
|
9
|
July 26 - July 27
|
USAXS
|
Gedrhardt/Whelchel
|
GUP 9916
|
3
|
July 27 - July 28
|
USAXS
|
Hammons/Alvarez/Stoltz
|
internal
|
3
|
|
|
|
|
|
August 8 (4pm) - August 9
|
USAXS
|
Ilavsky
|
setup
|
2
|
August 9 - August 11
|
USAXS
|
Tirumala
|
RA/GUP 10888
|
6
|
August 11 - August 12 (11:59pm)
|
USAXS
|
Ilavsky
|
Internal
|
5
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
January 29 - January 30
|
optics testing
|
Ilavsky
|
setup
|
3
|
*******
|
|
|
|
|
February 27 - February 28
|
USAXS
|
McNaney
|
GUP 9544
|
3
|
February 28 - February 29
|
USAXS
|
Pfeifer
|
GUP 6079
|
3
|
February 29 - March 1
|
USAXS
|
Ilavsky/Amonette
|
GUP 9198
|
3
|
March 1- March 3
|
USAXS
|
Kohls/Schaefer
|
GUP 9193
|
6
|
March 3 - March 4
|
USAXS
|
Allen
|
GUP 7560
|
3
|
******
|
|
|
|
|
March 5 - March 7
|
USAXS
|
Allen
|
GUP 7560
|
6
|
March 7 - March 8
|
USAXS
|
Beaucage/Sachit
|
internal
|
3
|
March 8 - March 10
|
USAXS
|
Ilavsky +
|
internal
|
6
|
|
|
Ghantasala Frederick
|
|
|
******
|
|
|
|
|
April 16 - April 19
|
USAXS
|
Allen
|
PUP
|
9
|
April 19 - April 20
|
USAXS
|
Schaefer/Kohls
|
GUP 9193
|
3
|
April 20 - April 21
|
USAXS
|
Ghantasala
|
internal
|
3
|
April 21 - April 24
|
USAXS
|
Van Buuren
|
GUP 9434
|
9
|
|
|
|
|
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
October 2 - October 3
|
optics testing
|
Ilavsky
|
setup
|
3
|
*******
|
|
|
|
|
November 14 - November 20
|
USAXS imaging
|
Long, Levine
|
GUP 8549
|
18
|
November 20 - November 21
|
USAXS imaging
|
Schaefer
|
internal
|
3
|
November 21 (till midnight)
|
USAXS imaging
|
Thiyaga
|
internal
|
2
|
******
|
|
|
|
|
November 23 - November 24
|
USAXS
|
ilavsky
|
beamline
|
3
|
November 24 - November 24 (4pm)
|
USAXS
|
Muralidharan
|
GUP 8759
|
1
|
November 24 (4pm) - November 27
|
USAXS
|
Schaefer
|
GUP 6140
|
8
|
******
|
|
|
|
|
December 12 - December 13 (4pm)
|
USAXS
|
Ghantasala
|
GUP 8495
|
4
|
December 12 (4pm) - December 16
|
USAXS
|
Allen
|
PUP
|
8
|
December 16 - December 18
|
SBUSAXS
|
Anderson
|
GUP 8595
|
6
|
December 18 - December 19
|
SBUSAXS
|
Mickievicz
|
GUP 8036
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
June 13 - June 14
|
SBUSAXS
|
Ilavsky
|
setup
|
3
|
June 14 - June 18
|
SBUSAXS
|
Radlinski
|
GUP 7766
|
12
|
*******
|
|
|
|
|
July 5 - July 7
|
SBUSAXS
|
Ben Anderson
|
GUP 7508
|
6
|
July 7 - July 8 (4pm)
|
SBUSAXS
|
TBA
|
|
4
|
July 8 (4pm) - July 10
|
SBUSAXS
|
Verploegen
|
GUP 7812
|
5
|
July 11 - July 16
|
AUSAXS
|
Allen + Braun
|
PUP/GUP 6840
|
15
|
*******
|
|
|
|
|
August 15 - August 17
|
USAXS
|
Willey
|
GUP 7300
|
6
|
August 17 - August 19
|
USAXS
|
SXNS
|
|
6
|
|
|
Pfeifer
|
GUP 6079
|
|
|
|
Muralidharan
|
GUP 7505
|
|
August 19 - August 21
|
USAXS
|
Gerhardt
|
GUP 7561
|
6
|
August 21 - August 22
|
USAXS
|
Dobbins
|
GUP 7585
|
3
|
August 22 - August 23
|
USAXS
|
TBA
|
|
3
|
Dates
|
geometry
|
user
|
beam time source
|
shifts
|
February 28 - March 2
|
USAXS
|
Ilavsky setup/testing, mail in samples
|
|
|
March 2 - March 3
|
AUSAXS 11keV
|
Beaucage
|
GUP 7504
|
3
|
March 3 - March 4
|
SBUSAXS
|
Ilavsky setup
|
|
|
March 4 - March 5
|
SBUSAXS
|
Mock
|
GUP 7197
|
2
|
March 5 - March 6
|
SBUSAXS
|
Ramakrishnan
|
GUP 7137
|
3
|
March 6 - March 12
|
USAXS Imaging
|
Long/Levine
|
PUP, internal beamtime
|
9 /6
|
March 14 - March 19
|
USAXS
|
Allen
|
PUP, GUP 7560
|
9 /6
|
March 19 - March 22
|
USAXS
|
Lorenzana
|
GUP 7373
|
6
|
March 22 - March 24
|
USAXS
|
Doug Kohls
|
GUP 7293
|
6
|
March 24 - March 25
|
USAXS
|
Pfeifer
|
GUP 6079
|
3
|
March 25 - March 26
|
USAXS
|
Dobbins
|
GUP 7585
|
3
|
March 26 - March 27
|
USAXS
|
Isaacs-Sodeye
|
GUP 7407
|
3
|